Concrete Patio Cost Calculator — Greenville SC

Concrete patio installation in Greenville SC, South Carolina costs slightly below the national average. Patio size, concrete finish (plain vs. stamped vs. exposed aggregate), and ground prep are the main cost drivers.

Low estimate$2,200
Average$6,800
High estimate$19,800

Patio square footage

Patio square footage 300

Quality Tier

Standard materials, solid craftsmanship

Scope of Work

Labor

Labor portion of total cost 40%

Concrete Patio Cost in Greenville SC: 2026 Guide

Use the calculator above to get a quick estimate. The guide below explains what drives concrete patio costs in Greenville SC and what to expect from contractors in Greenville SC.

Typical Concrete Patio Costs in Greenville SC

Project ScopeLowHigh
Small patio (100–150 sqft, plain)$800$1,400
Average patio (250–350 sqft, plain/broom)$2,200$5,600
Stamped patio (300 sqft, basic pattern)$5,600$6,800
Large stamped patio (600+ sqft, premium)$6,800$19,800

What Affects Concrete Patio Costs in Greenville SC?

Labor rates: Contractors in Greenville SC charge $40–$81/hour for concrete patio work — slightly below the national average.

Material costs: Material prices in the South region are slightly below national average due to local supply, transportation costs, and market demand.

Project complexity: Site conditions, permitting requirements, and non-standard layouts can add 15–30% to total project cost.

Frequently Asked Questions

How much does a concrete patio cost in Greenville SC?
A concrete patio in Greenville SC costs $2,200–$19,800. Plain broom-finish concrete runs $2,200–$5,600 for a 300 sqft patio. Stamped concrete with a stone or brick pattern runs $6,800–$19,800 for the same size. The finish choice is the single biggest cost variable.
How thick should a concrete patio be in Greenville SC?
Residential concrete patios should be at least 4" thick, poured over a compacted gravel base. In Greenville SC, if you expect heavy vehicle traffic or have expansive soils, 6" with rebar is recommended. Thicker slabs cost 20–30% more but last significantly longer.
How long does concrete last in Greenville SC?
A properly poured and sealed concrete patio lasts 30–50+ years. In Greenville SC, freeze-thaw cycles (if applicable) are the biggest threat — use air-entrained concrete and reseal every 2–3 years. Stamped concrete requires more frequent sealing to maintain color.
Stamped concrete vs. pavers — which is better in Greenville SC?
Stamped concrete is cheaper upfront ($2,200–$5,600 vs. $15–$30/sqft for pavers) and seamless, but cracks are harder to repair. Pavers cost more but individual units can be replaced. In Greenville SC, pavers are better in freeze-thaw climates; stamped concrete excels in mild climates.

Create Pro Estimates in 60 Seconds

Use Cost Estimator app to generate detailed concrete patio estimates — share as PDF directly with clients.

Estimated cost in Greenville SC

$0
Range: $0 – $0
Materials$0
Labor$0
City multiplier0.90x

Want a full itemized estimate? Use the free app: